Apr 01, 2020 Leave a message

Low Cost Prefabricated Light Steel Villa

 

Low Cost Prefabricated Light Steel Villa Basic Info

 

Wall Panel: PU Embossed Sandwich Panel & Fiber Cement Board
Floor Deck Board: Galvanized Steel Sheet
Downspout: PVC Pipes
Roof Insulation: EPS Sandwich Board Glaze Tile
Building Area: Customer Made
Size: Customer Made
Gutter: PVC
Crane: with or Without, We Can Design as Per Required
Trademark: FoToon Housing Service
Transport Package: Use Intergrated Steel Rack, Flat Packing
Specification: custom made
Origin: China
HS Code: 9406900090

Prefabricated light steel villa prefab house structure for residential use
 

(I)

Primary structure for steel construction building

Light steel keel

Wall system: 140/89mm; Roof system: 70mm(Q550 Galvanized)

(II)

MAINTENANCE of light gauge steel construction building

EXTERNAL WALL

27mmPU EMBOSSED STEEL PANEL+HOUSE WRAP+12mmOSB BOARD+150mm INSULATION GLASS WOOL+12mm WATERPROOF GYPSUM BOARD

INTERNAL WALL

12mm WATERPROOF GYPSUM BOARD+150mm INSULATION GLASS WOOL

FALSE CEILING  

0.5mm COLOR STEEL SHEET

9mm GYPSM BOARD

FLOOR SUPPORTING BOARD  

1mm GALVANIZED MODELED FLOOR SUPPORTING BOARD

GALVANIZE

FLASHING EDGING

0.5mm SELF FOLDING COLOR STEEL SHEET

DOOR    

1200*200mm STEEL DOOR

960*2050mm STEEL DOOR

800*210mm PVC MODELED DOOR

700*210mm PVC MODELED DOOR

(III)  

FITTINGS  of steel construction building

HARDWARE

 

RAINWATER SYSTEM  

75*50mmPVC RECTANGULAR TUBLE

PVC EAVES GUTTER(WITH ACCESSORIES)

ELECTRICITY

LIGHTS, SWITCHES, SOCKETS, DISTRIBUTION BOX

1.Contact us
Contact us by mail: stevexue@ftprefabhouse.com or Phone: +86-18667160915. 
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
FoToon Housing Service provides complete installation drawing,or we send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers' request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.

2.What's your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 30 days after receive deposit. Large order delivery time should be arranged separately.

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, we will responsible for all quality problems caused by production.

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of light steel keel structure is 50 years

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry